User Time Tracking (listed under Time in Measure Performance) answers who logged time, on what, and when? It lists every person with time entries in the range, their total hours, and the entries beneath them. Use it for timesheet review, billing checks, and balancing workloads. The hours come from time logged on items; for how that is recorded see time tracking in the item workspace.
There is no Show selector; the report always measures hours. The Grand Total of hours for everything listed appears at the top right.
Each top-level row is a person with their total hours. Expand a person to see:
ITEM-123 Title) with its time entries, plus a Subtasks group for time recorded on subtasks.Columns are User / Item (or Persona / User / Item), Description (the entry's note), Date, Done (the item's completion date, if completed), and Hrs Spent.
If the range contains a very large number of entries the report shows a banner, Showing first N items ... (limit reached), and hides some rows. The hour totals remain accurate.
A time entry is included when it is completed (a running timer is not counted until stopped), its start date falls in the range in your organization's timezone, and its item passes your filters. Manual time recorded on a subtask is included under the subtask's assignee. Archived items are excluded unless Include Archived is on under Options.
With Group By set to Persona, the top-level rows total time under Engineer, QA Analyst, or whichever personas your organization defines. Expand a persona to see the people whose time contributes to it, then expand a person to see their entries. A person appears under more than one persona when they recorded time in different personas, but each entry belongs to exactly one persona, so hours are never doubled.
New time entries capture the persona chosen on the item only when the person logging the time holds that persona; otherwise they capture that person's own first active persona, so a PM logging time on an engineer's card records PM time. A person with no active persona records Unspecified. Changing an assignment or reordering a member's personas later does not move completed time. Older time without a captured persona shows as Unspecified. Editing an existing entry keeps its captured persona; setting it to zero and recording time again starts a new capture.
To compare personas month by month across an item hierarchy, use the Time Allocation Matrix. With the same items, range, and permissions, the two reports include the same completed entries and dated manual subtask time.
Teams describe where work lives, and a person can be on many of them, so they do not say who reports to whom. For a reporting structure, use a user label group: for example, a Home Team group with one label per team, and one label on each person.
Click Export, name the export, and click Export Report; collect the file from the Exports tab. The workbook has a Summary sheet with totals per user, a By persona sheet when your organization uses personas, an Item Time Entries sheet with every entry, and a Subtask Time sheet.
Report: Burn Down
Track remaining work over time, read the Remaining, Completed, Projected and Idealized series, and use Normalize Scope to see your true burn rate when scope arrives mid-cycle.
Report: Churn
Measure how much work was added to or pulled out of your cycles, or created and archived over time, and use it to spot unstable plans.