Measure Performance: Reports

Reports Overview

What the Measure Performance module contains, who can open it, how to pick a report, and how to drill in, save a view, and export to Excel.

Measure Performance is DevStride's reporting module. Every report reads the same work items, status changes, and time entries that your boards and workstreams use, so the numbers here agree with what your team sees day to day.

Use it when you need to answer a question about the work rather than find a specific item: are we on track, where is work piling up, how fast do we finish things, how much slipped out of the last cycle, where did the hours go?

Open the module

  1. Click Measure Performance in the left sidebar. The page opens on its Analytics tab; the Exports tab next to it holds your finished Excel exports.
  2. Pick a report from the list on the left. Reports are grouped under Agile and Time.
  3. Scope the report with the toolbar: For (item type), Range, Show, and the Filters button. These controls work the same on every report; see Report Customization Options.

You can also jump straight to a report from anywhere: press Cmd-K (Mac) or Ctrl-K (Windows) and type the report name, for example Report: Throughput.

Which report answers which question

ReportQuestion it answersMeasures
Current ProgressRight now, how much of this work is done, assigned, planned, and estimated?Snapshot of today, no date range
Trending ProgressHow has the completed / estimated / assigned / planned picture changed over time?Period by period
Cycle TimeHow long does an item take to get from one status to another?Per completed item
ThroughputHow much work do we finish per day, week, or month?Period by period
Cumulative FlowHow much work sits in each status over time, and where is it piling up?Period by period
Burn DownHow much is left, and when will it be gone at our current pace?Period by period
Burn UpHow much have we finished, and how does that compare to the total scope?Period by period
ChurnHow much work was added to or pulled from a cycle, or created and archived?Per cycle or per period
VelocityHow much did we finish in each cycle?Per cycle
Cycle Carry-ForwardWhat happened to the work planned into each cycle: finished, carried, dropped, or still open?Per cycle
User Time TrackingWho logged time, on what, and when?Time entries
Time Allocation MatrixWhere did the hours go across our hierarchy, month by month?Time entries

The first ten are under Agile; the last two are under Time.

Drill into the data

Most charts have Chart, Items, and Transactions tabs above them.

  • Items lists the work items behind each period or cycle, grouped the same way as the chart, with a count in each group header. Click an item to open it; items are editable from here, so you can act on what you find.
  • Transactions lists the underlying status changes the chart was built from.
  • Current Progress works differently: each donut has its own Items button. User Time Tracking and Time Allocation Matrix are tables already.

Save a view

Click Views in the toolbar to save the current report setup (filters, range, measure, and report-specific selectors such as cycles or statuses) as a saved view, visible only to you or to coworkers. Reopening the view restores the setup. This is how you build a "dashboard" you return to each week. See Creating and sharing views.

Export to Excel

Every report except Cycle Carry-Forward exports to a single .xlsx workbook (Cycle Carry-Forward has its own Export CSV button; the Time Allocation Matrix has its own export flow described on its page).

  1. Set up the report the way you want it: filters, Show, and Range.
  2. Click Export in the toolbar.
  3. In Export Report to Excel, enter an Export Name (it defaults to Untitled) and click Export Report.
  4. The export runs in the background. Open the Exports tab to download it when it finishes. You can rename or delete exports there.

The workbook contains an Export Info sheet (report type, organization, when it ran, date range, granularity, and applied filters), the chart's summary data (for example Throughput, Churn, Velocity, or Cycle Metrics Summary), and the itemized data behind the Items tab. Viewing a report is enough to export it; there is no separate export permission.