Every report in Measure Performance shares one toolbar. Learn it once and you can scope any chart: pick the item types (For), the time window (Range), the unit (Show), narrow the items with Filters, then drill into the Items tab or tune the chart under Options. Report-specific selectors (Cycles, Status, From / To, Of) sit in the same toolbar and are described on each report's page.
Your selections are remembered per organization in your browser, so a report reopens the way you left it. To share a setup with coworkers, save it with Views.
When your organization has more than one item type, the For selector limits the report to the types you pick. It reads Base Items when every type is included. Choosing a parent type (for example Epic) includes the base-level types beneath it. Use it to keep a report on the items that carry estimates and time, such as stories and defects, rather than their containers. See Item Types.
Show sets the unit the chart adds up:
| Option | What a bar or point adds up | Available |
|---|---|---|
| Count | Number of items | Always (default) |
| Time Estimate | Hours estimated on the items | When any item type has time estimates enabled |
| Point Estimate | Points on the items | When any item type has point effort enabled |
| Time Spent | Hours logged on the items | Always, except on Velocity and Cycle Carry-Forward |
The chart's y-axis title follows your choice: Item Count, Time Estimate (hours), Point Estimate, or Time Spent (hours). Cycle Time has no Show selector; it always measures elapsed time.
The Range dropdown has two modes. The field beside it is labelled Dates or TimeBoxes to match, and reads None Selected until you choose something.
Click the Dates field, pick a preset or Custom Range, and click Apply Date Range. Presets: This week, Last week, Last 7 days, Last 14 days (the default), Last 30 days, This month, This month to date, Last month, Last 3 months, This quarter, Last quarter, This year, Last year.
The range also decides the chart's granularity: up to 31 days plots daily, 32 to 92 days weekly, and longer ranges monthly. Weeks run Monday to Sunday. Nothing is plotted past today; the period containing today is drawn as a partial period.
Click the TimeBoxes field to open the TimeBox Selector, tick one or more timeboxes from your cadences (for example the sprints in a release), and click Apply. The report's date range becomes the span from the earliest selected start to the latest selected end, and the field shows the names (Sprint 1, Sprint 2 +3).
Current Progress, Velocity, and Cycle Carry-Forward have no Range: Current Progress is a snapshot of today, and the other two are scoped by the cycles you select.
Click Filters to narrow the items a report counts. Applied filters show as pills in the toolbar; click a pill's x to remove it. The panel opens with the AI prompt box followed by these filters:
| Filter | Narrows the report to items that... |
|---|---|
| Assignee | are assigned to the selected people (or to no person) |
| Board | are on the selected boards or cycles |
| Completion Date | were completed within a window |
| Creator | were created by the selected people |
| Due Date | are due within a window |
| Field | match values of your custom fields |
| Item Type | are of the selected types (same effect as For) |
| Parent | sit beneath the selected workstreams or items, at any depth |
| Persona | are assigned to the selected personas (shown when your organization uses personas) |
| Priority | have the selected priorities |
| Start Date | start within a window |
| Status | are in the selected statuses |
| Tag | carry any of the selected tags |
| Team | belong to the selected teams |
| Time Spent | have at least / at most a given amount of logged time |
| Watchers | are watched by the selected people |
Reports do not offer Advanced Filters (AND / OR rule groups): the charts count items by the filters above only, and a report view saved with advanced rules opens without them. See Filters: Reports.
A few reports hide filters that do not apply: Velocity and Churn (in Added / Removed mode) hide Team and Board because the cycle selector sets the scope; Cycle Carry-Forward hides Board and Status; User Time Tracking swaps some item filters for an entry Length filter.
Above most charts you can switch between Chart, Items, and Transactions:
Current Progress has an Items button on each donut instead. User Time Tracking and the Time Allocation Matrix are tables already. Cycle Carry-Forward has Chart and Items only.
Click Options to change how the chart is drawn. Changes are remembered per report and show as a pill (for example 2 chart elements hidden or Y max: 50).
| Option | What it does |
|---|---|
| Include Archived | Counts archived items in the report |
| Normalize Scope | Burn Down only; see Burn Down |
| Y-Axis Max | Pins the top of the y-axis. Leave it on Auto unless one outlier flattens the rest of the chart; clear it with the x |
| Series / X-Axis / Y-Axis toggles | Values shows or hides the numbers printed on that part of the chart; Label shows or hides its title |
You can also hide a single series by clicking its entry in the chart legend.
Using AI for powerful reports
Describe the work you want a report to cover in plain English and let the AI filter set the report's filters for you.
Report: Current Progress
Read the Current Progress donuts (completed, assigned, planned, estimated), drill into the items behind each one, and control how the Planned donut treats finished work.