The timeline is the right half of the chart. Everything you do to a bar there is written to the real item: drag a bar and the item's start and due dates change everywhere else in DevStride. This page covers the interactions. For the columns on the left, see Navigating the table.
You can drag bars only if you can edit the chart and update the item. Rows you cannot change still display, but their bars do not move.
Hover a bar to reveal its handles.
| Do this | Result |
|---|---|
| Drag the middle of the bar | Moves the bar: start and due date shift together, duration unchanged |
| Drag the left edge | Changes the start date |
| Drag the right edge | Changes the due date |
| Drag a milestone diamond | Changes the milestone date |
| Click a bar that shows Date missing | Sets the missing start or due date to the inferred date shown in the tooltip |
In the example, the task is due 5/19/25 with a 1-day duration (2).

Dragging the right edge to 9 days updates the Due date and Duration cells as you drag (4).

The item itself now carries the new dates (5).

While a drag is in flight the status strip at the top of the chart shows Saving dates.... If the item has dependents and Linked mode is on, the strip stays until the cascade finishes.
Initiative bars cannot be dragged. Their dates are inferred from the work inside them; move the children instead.
The Horizontal zoom slider steps through ten presets. The number beside it is the scale in pixels per day; click it to pick a preset directly.
| Preset | Scale | Header shows |
|---|---|---|
| Years | 0.25 px/day (1 px = 4 days) | Years, with quarters beneath |
| Years | 0.5 px/day | Years / Quarters |
| Years | 1 px/day | Years / Quarters |
| Quarters | 2 px/day | Quarters / Months |
| Quarters | 4 px/day (default for new charts) | Quarters / Months |
| Months | 8 px/day | Months / Weeks |
| Months | 16 px/day | Months / Weeks |
| Weeks | 32 px/day | Weeks / Days |
| Weeks | 64 px/day | Weeks / Days |
| Days | 100 px/day | Days, with the year above |
Double-click an empty part of the timeline to zoom in one step centered on that point; Shift + double-click zooms out. The zoom level is remembered per chart in your browser and is stored in saved views.

Snap to cycles (magnet) overlays one board folder's cycles, such as a team's sprints, as bands behind the bars. With a folder selected, dragging behaves differently for work items:
Workstreams and milestones ignore the bands; they are never assigned to a board.
To choose or change the folder, click the magnet. Here the chart shows a 2-week cadence (2), and the dialog (3) lets you expand to the Engineering folder (4).

Select the program-increment folder for a longer planning cycle (5), or expand further to a single team's 2-week sprint folder (6).

Click Select (7).

The cadence appears as bands with the sprint names in the header (8).

If the organization setting Sync work item dates with their cycles is on, moving an item onto a cycle board also snaps its dates to that cycle. See Using cycle boards.
Dependencies in DevStride are the same Dependency / Dependent relationships you set in the item workspace; the chart just gives you a place to draw them. There are two link types on the chart:
| Link | Line | Meaning |
|---|---|---|
| Dependency | Orange, solid, from the end of the blocker to the start of the blocked item | The target item depends on (is blocked by) the source. Linked mode follows these. |
| Related | Green, dashed, start to start | An informational connection. Never moves dates. |
To draw one:

The chart refuses links that would not make sense and says why in the status strip: Not allowed. Direct ancestor or descendant (you cannot link a workstream to something inside it, or link two items that are already related) and Not allowed. Dependency loop (the link would make an item depend on itself through the chain). Milestones can be either end of a link.
To remove a link, click the line to select it and use the remove control that appears. Hover any bar to highlight all of its lines; Hide Relationships in Options hides them all.
Relationships also show in the table's Relationships column, in the item workspace, and in the Items Table. Click the relationships icon in the item workspace (1) for the full list (2).

View Graph (3) renders the chain.

See Manage and Edit Dependencies and the Dependency Graph.
The link / unlink button in the control bar decides what happens to dependent items when you move a due date on this chart.
Press Shift + M to switch. The choice is remembered in your browser and saved in views. The Scenario Information list shows which mode each recorded move used.

The mode on the chart overrides the organization default for actions taken on the chart. For how the cascade is calculated, what triggers it, and the organization-wide setting, see Link Mode.
If you want to drag bars around to answer "what if the API work slips two weeks?" without changing anyone's dates, record a scenario first. Date moves made while recording stay in your browser until you save them as a named snapshot, and the snapshot can then be overlaid on the live chart for comparison. See Scenario Planning.
Viewing Gantt Charts
Pick a chart, read the bars and rollups, expand to the level you need, filter to one team, look through another team's cadence, and save the result as a shareable view.
Using Gantt Charts: Navigating the table
What each column in the Gantt table shows, how to add Items Table columns, which cells you can edit for initiatives, milestones, workstreams and items, how to tick rows and edit them together, the row menu, how to set dates from descendants, and how to reorder rows with the mouse or the keyboard.